{"id":30428,"date":"2026-10-24T08:00:00","date_gmt":"2026-10-24T07:00:00","guid":{"rendered":"https:\/\/e-lia.io\/?p=30428"},"modified":"2026-10-09T08:29:38","modified_gmt":"2026-10-09T07:29:38","slug":"how-to-track-action-deadlines-from-workplace-inspections","status":"publish","type":"post","link":"https:\/\/e-lia.io\/en\/blog\/how-to-track-action-deadlines-from-workplace-inspections\/","title":{"rendered":"How do you track deadlines for actions from workplace inspections?"},"content":{"rendered":"<p>You monitor action points from workplace inspections by recording them directly after the inspection with a clear owner, a realistic deadline, and a follow-up structure that automatically sends reminders when an action is approaching. Without that system, findings disappear into spreadsheets or paper lists and risks remain unresolved. In this article, we answer the most frequently asked questions about monitoring deadlines and following up on actions from workplace inspections.<\/p>\n<h2>Why do action points from inspections so often get lost?<\/h2>\n<p>Action points from workplace inspections get lost because after the inspection they are not linked to a responsible person, a concrete deadline, or a follow-up system. The finding is noted, but nobody feels ownership of it. Without ownership and visibility, an action point disappears into a pile of paper or a forgotten Excel file.<\/p>\n<p>There are a few recurring causes that compound this problem:<\/p>\n<ul>\n<li><strong>Manual recording:<\/strong> Paper checklists and separate spreadsheets offer no automatic reminders or status overview. An action point written down today is already out of sight next week.<\/li>\n<li><strong>No owner assigned:<\/strong> If a finding is not immediately assigned to a specific person, everyone assumes someone else will pick it up.<\/li>\n<li><strong>No follow-up moment:<\/strong> Without a planned follow-up moment or an automated reminder, there is no trigger to check the status.<\/li>\n<li><strong>Barrier to reporting:<\/strong> Employees on the shop floor often have no access to a laptop or company system, making it extra effort to pass on progress updates.<\/li>\n<\/ul>\n<p>The result is that risks identified during an inspection remain unresolved for weeks or months. That is not only undesirable from a safety perspective, but can also cause difficulties during audits or inspections by external parties.<\/p>\n<h2>Who is responsible for following up on inspection findings?<\/h2>\n<p>Responsibility for following up on inspection findings lies with the person designated as action owner, but overall responsibility for the system as a whole lies with the line manager or safety coordinator. Both roles are necessary: without an action owner nothing happens, without oversight from above actions fall through the cracks.<\/p>\n<p>In practice, it works well to distinguish between three roles:<\/p>\n<ul>\n<li><strong>The inspector or executor:<\/strong> Records the finding and indicates what action is required.<\/li>\n<li><strong>The action owner:<\/strong> The person who actually carries out the action, for example a technician, team leader, or facilities employee. This person is responsible for completing the action within the agreed deadline.<\/li>\n<li><strong>The monitor or coordinator:<\/strong> Maintains an overview of all outstanding actions, signals when deadlines are approaching or have been exceeded, and escalates when necessary.<\/li>\n<\/ul>\n<p>A common mistake is that the inspector also designates themselves as action owner for all findings. That does not work if the inspector has no direct influence over the execution. Assign actions to the person who can actually do the work and ensure that person is also aware of the assignment.<\/p>\n<h2>What tools can you use to track actions?<\/h2>\n<p>You can track and follow up on actions from <a href=\"https:\/\/e-lia.io\/en\/workplace-inspections\/\">digital workplace inspections<\/a> using a digital action management system, an inspection app, or a platform that combines recording and follow-up. The choice depends on the size of your organisation, the complexity of your inspections, and the extent to which employees have access to digital tools.<\/p>\n<p>The most commonly used options:<\/p>\n<ul>\n<li><strong>Spreadsheets (Excel or Google Sheets):<\/strong> Low-threshold and flexible, but offer no automatic reminders, no real-time status updates, and are error-prone with multiple users.<\/li>\n<li><strong>Project management tools (such as Asana, Trello, or Monday.com):<\/strong> Suitable for assigning tasks with deadlines and monitoring progress. They do require all parties involved to actively log in and use the tool.<\/li>\n<li><strong>Specialist inspection apps:<\/strong> Apps built specifically for workplace inspections combine recording findings with creating actions, assigning owners, and setting deadlines. Drawback: employees need to download the app and create an account.<\/li>\n<li><strong>Platforms via familiar channels such as WhatsApp:<\/strong> Platforms that operate via a channel employees already use daily significantly lower the barrier to follow-up. Actions and reminders arrive directly on the right person&#8217;s phone, without an extra app or login procedure.<\/li>\n<\/ul>\n<p>The best tool is the one your team actually uses. A sophisticated system that employees never open solves nothing. Choose a solution that fits the working methods and digital capabilities of the people on the shop floor.<\/p>\n<h2>How do you set realistic deadlines for inspection findings?<\/h2>\n<p>You set realistic deadlines for inspection findings based on the severity of the risk, the available capacity, and the dependencies of the action. A finding that poses a direct safety risk requires a shorter lead time than an improvement point that presents no immediate threat.<\/p>\n<p>A practical approach is to categorise findings by urgency and apply a standard lead time based on that category:<\/p>\n<ul>\n<li><strong>Immediate danger:<\/strong> Actions that pose an acute safety risk should be addressed as quickly as possible. Think of a defective safety device or a blocked emergency exit.<\/li>\n<li><strong>High risk:<\/strong> Findings that pose a serious risk but no immediate threat should be addressed within a short, agreed timeframe.<\/li>\n<li><strong>Improvement points:<\/strong> Findings that improve the situation but pose no acute risk can be given a longer lead time, provided they are not forgotten.<\/li>\n<\/ul>\n<p>In addition to urgency, you should also consider feasibility. A deadline is only realistic if the action owner also has the resources, authority, and time to carry out the action. Always briefly discuss the deadline with the action owner when assigning it, so that you do not set a date that is unrealistic from the outset.<\/p>\n<h2>How do you ensure automatic reminders for approaching deadlines?<\/h2>\n<p>You ensure automatic reminders for approaching deadlines by using a digital system that sends reminders based on the set deadline and the status of the action. Manual follow-up via email or verbal check-ins is too dependent on the coordinator&#8217;s discipline and falls short during busy periods.<\/p>\n<p>Effective automatic reminders meet a number of conditions:<\/p>\n<ul>\n<li><strong>Timely:<\/strong> The reminder is sent before the deadline passes, not after. A reminder one or two days in advance gives the action owner time to take action.<\/li>\n<li><strong>Targeted:<\/strong> The reminder goes to the right person, namely the action owner, and not to a general inbox that nobody reads.<\/li>\n<li><strong>Low-threshold:<\/strong> The reminder reaches the recipient via a channel they use every day. A push notification on the phone works better than an email that gets missed in the flow.<\/li>\n<li><strong>Escalating:<\/strong> If a deadline is exceeded without the action being completed, a signal is automatically sent to the line manager or coordinator.<\/li>\n<\/ul>\n<p>Platforms that operate via WhatsApp offer a practical advantage here: the reminder arrives directly in a familiar environment, without the recipient needing to open an extra app. That increases the likelihood that the reminder is actually seen and acted upon.<\/p>\n<h2>How do you report on the progress of outstanding actions?<\/h2>\n<p>You report on the progress of outstanding actions via a central overview that shows in real time which actions are open, which have been completed, and which deadlines have been exceeded. Good reporting makes it possible to intervene in a timely manner and provides a clear picture during audits or internal evaluations of how inspection findings are being followed up.<\/p>\n<p>A useful progress report contains at least the following elements:<\/p>\n<ul>\n<li>An overview of all outstanding actions, sorted by deadline<\/li>\n<li>The name of the action owner per action<\/li>\n<li>The status of each action: open, in progress, or completed<\/li>\n<li>A flag for actions whose deadline has passed<\/li>\n<li>A historical overview of completed actions, including the date of completion<\/li>\n<\/ul>\n<p>Report regularly and at a fixed time, so that line managers and safety coordinators have an up-to-date picture. This does not need to be an extensive document: a clear dashboard or a weekly summary is sufficient in many cases. Do ensure that the reporting is not only used internally, but is also available for external audits or inspections when required.<\/p>\n<h2>How E-lia helps monitor deadlines from workplace inspections<\/h2>\n<p>Following up on workplace inspections and monitoring deadlines requires a system that reaches employees where they already are, without additional barriers. That is exactly what we offer with E-lia. Via WhatsApp you carry out digital workplace inspections, record findings immediately, and link actions to the right person with a concrete deadline.<\/p>\n<ul>\n<li>Inspection forms are sent directly to the executor&#8217;s phone, without an app or login procedure<\/li>\n<li>Findings are recorded with a timestamp and photo, so you always have a complete digital record<\/li>\n<li>Actions are assigned to an owner and given a deadline, with automatic reminders via WhatsApp<\/li>\n<li>The dashboard shows in real time which actions are open, which have been completed, and where lead times are being exceeded<\/li>\n<li>Reports can be exported with a single click for internal evaluations or external audits<\/li>\n<li>AI-assisted translations in more than 50 languages ensure that multilingual employees also receive the right information<\/li>\n<\/ul>\n<p>Would you like to see how E-lia makes following up on workplace inspections easier in your organisation? <a href=\"https:\/\/e-lia.io\/en\/workplace-inspections\/\">Discover our workplace inspection solution<\/a> and <a href=\"https:\/\/e-lia.io\/en\/contact\/\">request a demo via our contact form<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Tracking action points from workplace inspections starts with ownership, realistic deadlines, and automatic reminders. Find out how.<\/p>\n","protected":false},"author":4,"featured_media":30764,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[117],"tags":[],"class_list":["post-30428","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-workplace-inspections"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>How do you track deadlines for actions from workplace inspections? - E-lia<\/title>\n<meta name=\"description\" content=\"Workplace inspection follow-up: assign actions, automate reminders and track progress so findings are never lost.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/e-lia.io\/en\/blog\/how-to-track-action-deadlines-from-workplace-inspections\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"How do you track deadlines for actions from workplace inspections? - E-lia\" \/>\n<meta property=\"og:description\" content=\"Workplace inspection follow-up: assign actions, automate reminders and track progress so findings are never lost.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/e-lia.io\/en\/blog\/how-to-track-action-deadlines-from-workplace-inspections\/\" \/>\n<meta property=\"og:site_name\" content=\"E-lia\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-24T07:00:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/e-lia.io\/wp-content\/uploads\/2026\/09\/inspection-checklist-clipboard-warehouse-hardhat.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"768\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"Kees van Nuland\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Kees van Nuland\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"7 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/e-lia.io\\\/en\\\/blog\\\/how-to-track-action-deadlines-from-workplace-inspections\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/e-lia.io\\\/en\\\/blog\\\/how-to-track-action-deadlines-from-workplace-inspections\\\/\"},\"author\":{\"name\":\"Kees van Nuland\",\"@id\":\"https:\\\/\\\/e-lia.io\\\/en\\\/#\\\/schema\\\/person\\\/5446f7ef2b87fe46a081549c2cc653dc\"},\"headline\":\"How do you track deadlines for actions from workplace inspections?\",\"datePublished\":\"2026-10-24T07:00:00+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/e-lia.io\\\/en\\\/blog\\\/how-to-track-action-deadlines-from-workplace-inspections\\\/\"},\"wordCount\":1483,\"publisher\":{\"@id\":\"https:\\\/\\\/e-lia.io\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/e-lia.io\\\/en\\\/blog\\\/how-to-track-action-deadlines-from-workplace-inspections\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/e-lia.io\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/inspection-checklist-clipboard-warehouse-hardhat.webp\",\"articleSection\":[\"Workplace Inspections\"],\"inLanguage\":\"en-GB\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/e-lia.io\\\/en\\\/blog\\\/how-to-track-action-deadlines-from-workplace-inspections\\\/\",\"url\":\"https:\\\/\\\/e-lia.io\\\/en\\\/blog\\\/how-to-track-action-deadlines-from-workplace-inspections\\\/\",\"name\":\"How do you track deadlines for actions from workplace inspections? - E-lia\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/e-lia.io\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/e-lia.io\\\/en\\\/blog\\\/how-to-track-action-deadlines-from-workplace-inspections\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/e-lia.io\\\/en\\\/blog\\\/how-to-track-action-deadlines-from-workplace-inspections\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/e-lia.io\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/inspection-checklist-clipboard-warehouse-hardhat.webp\",\"datePublished\":\"2026-10-24T07:00:00+00:00\",\"description\":\"Workplace inspection follow-up: assign actions, automate reminders and track progress so findings are never lost.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/e-lia.io\\\/en\\\/blog\\\/how-to-track-action-deadlines-from-workplace-inspections\\\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/e-lia.io\\\/en\\\/blog\\\/how-to-track-action-deadlines-from-workplace-inspections\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/e-lia.io\\\/en\\\/blog\\\/how-to-track-action-deadlines-from-workplace-inspections\\\/#primaryimage\",\"url\":\"https:\\\/\\\/e-lia.io\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/inspection-checklist-clipboard-warehouse-hardhat.webp\",\"contentUrl\":\"https:\\\/\\\/e-lia.io\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/inspection-checklist-clipboard-warehouse-hardhat.webp\",\"width\":1024,\"height\":768,\"caption\":\"Worn metal clipboard with color-coded inspection checklist beside a hard hat and smartphone on a concrete warehouse floor.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/e-lia.io\\\/en\\\/blog\\\/how-to-track-action-deadlines-from-workplace-inspections\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/e-lia.io\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"How do you track deadlines for actions from workplace inspections?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/e-lia.io\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/e-lia.io\\\/en\\\/\",\"name\":\"E-lia\",\"description\":\"Leren via Whatsapp\",\"publisher\":{\"@id\":\"https:\\\/\\\/e-lia.io\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/e-lia.io\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/e-lia.io\\\/en\\\/#organization\",\"name\":\"E-lia\",\"url\":\"https:\\\/\\\/e-lia.io\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/e-lia.io\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/e-lia.io\\\/wp-content\\\/uploads\\\/2023\\\/02\\\/E-lia-logo.svg\",\"contentUrl\":\"https:\\\/\\\/e-lia.io\\\/wp-content\\\/uploads\\\/2023\\\/02\\\/E-lia-logo.svg\",\"width\":122,\"height\":44,\"caption\":\"E-lia\"},\"image\":{\"@id\":\"https:\\\/\\\/e-lia.io\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/69587130\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/e-lia.io\\\/en\\\/#\\\/schema\\\/person\\\/5446f7ef2b87fe46a081549c2cc653dc\",\"name\":\"Kees van Nuland\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b5819008a7de507cf4fed2e77945c8a3bf39ab060e9e3422cc6dd4f361e1dd7c?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b5819008a7de507cf4fed2e77945c8a3bf39ab060e9e3422cc6dd4f361e1dd7c?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b5819008a7de507cf4fed2e77945c8a3bf39ab060e9e3422cc6dd4f361e1dd7c?s=96&d=mm&r=g\",\"caption\":\"Kees van Nuland\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"How do you track deadlines for actions from workplace inspections? - E-lia","description":"Workplace inspection follow-up: assign actions, automate reminders and track progress so findings are never lost.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/e-lia.io\/en\/blog\/how-to-track-action-deadlines-from-workplace-inspections\/","og_locale":"en_GB","og_type":"article","og_title":"How do you track deadlines for actions from workplace inspections? - E-lia","og_description":"Workplace inspection follow-up: assign actions, automate reminders and track progress so findings are never lost.","og_url":"https:\/\/e-lia.io\/en\/blog\/how-to-track-action-deadlines-from-workplace-inspections\/","og_site_name":"E-lia","article_published_time":"2026-10-24T07:00:00+00:00","og_image":[{"width":1024,"height":768,"url":"https:\/\/e-lia.io\/wp-content\/uploads\/2026\/09\/inspection-checklist-clipboard-warehouse-hardhat.webp","type":"image\/webp"}],"author":"Kees van Nuland","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Kees van Nuland","Estimated reading time":"7 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/e-lia.io\/en\/blog\/how-to-track-action-deadlines-from-workplace-inspections\/#article","isPartOf":{"@id":"https:\/\/e-lia.io\/en\/blog\/how-to-track-action-deadlines-from-workplace-inspections\/"},"author":{"name":"Kees van Nuland","@id":"https:\/\/e-lia.io\/en\/#\/schema\/person\/5446f7ef2b87fe46a081549c2cc653dc"},"headline":"How do you track deadlines for actions from workplace inspections?","datePublished":"2026-10-24T07:00:00+00:00","mainEntityOfPage":{"@id":"https:\/\/e-lia.io\/en\/blog\/how-to-track-action-deadlines-from-workplace-inspections\/"},"wordCount":1483,"publisher":{"@id":"https:\/\/e-lia.io\/en\/#organization"},"image":{"@id":"https:\/\/e-lia.io\/en\/blog\/how-to-track-action-deadlines-from-workplace-inspections\/#primaryimage"},"thumbnailUrl":"https:\/\/e-lia.io\/wp-content\/uploads\/2026\/09\/inspection-checklist-clipboard-warehouse-hardhat.webp","articleSection":["Workplace Inspections"],"inLanguage":"en-GB"},{"@type":"WebPage","@id":"https:\/\/e-lia.io\/en\/blog\/how-to-track-action-deadlines-from-workplace-inspections\/","url":"https:\/\/e-lia.io\/en\/blog\/how-to-track-action-deadlines-from-workplace-inspections\/","name":"How do you track deadlines for actions from workplace inspections? - E-lia","isPartOf":{"@id":"https:\/\/e-lia.io\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/e-lia.io\/en\/blog\/how-to-track-action-deadlines-from-workplace-inspections\/#primaryimage"},"image":{"@id":"https:\/\/e-lia.io\/en\/blog\/how-to-track-action-deadlines-from-workplace-inspections\/#primaryimage"},"thumbnailUrl":"https:\/\/e-lia.io\/wp-content\/uploads\/2026\/09\/inspection-checklist-clipboard-warehouse-hardhat.webp","datePublished":"2026-10-24T07:00:00+00:00","description":"Workplace inspection follow-up: assign actions, automate reminders and track progress so findings are never lost.","breadcrumb":{"@id":"https:\/\/e-lia.io\/en\/blog\/how-to-track-action-deadlines-from-workplace-inspections\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/e-lia.io\/en\/blog\/how-to-track-action-deadlines-from-workplace-inspections\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/e-lia.io\/en\/blog\/how-to-track-action-deadlines-from-workplace-inspections\/#primaryimage","url":"https:\/\/e-lia.io\/wp-content\/uploads\/2026\/09\/inspection-checklist-clipboard-warehouse-hardhat.webp","contentUrl":"https:\/\/e-lia.io\/wp-content\/uploads\/2026\/09\/inspection-checklist-clipboard-warehouse-hardhat.webp","width":1024,"height":768,"caption":"Worn metal clipboard with color-coded inspection checklist beside a hard hat and smartphone on a concrete warehouse floor."},{"@type":"BreadcrumbList","@id":"https:\/\/e-lia.io\/en\/blog\/how-to-track-action-deadlines-from-workplace-inspections\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/e-lia.io\/en\/"},{"@type":"ListItem","position":2,"name":"How do you track deadlines for actions from workplace inspections?"}]},{"@type":"WebSite","@id":"https:\/\/e-lia.io\/en\/#website","url":"https:\/\/e-lia.io\/en\/","name":"E-lia","description":"Leren via Whatsapp","publisher":{"@id":"https:\/\/e-lia.io\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/e-lia.io\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/e-lia.io\/en\/#organization","name":"E-lia","url":"https:\/\/e-lia.io\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/e-lia.io\/en\/#\/schema\/logo\/image\/","url":"https:\/\/e-lia.io\/wp-content\/uploads\/2023\/02\/E-lia-logo.svg","contentUrl":"https:\/\/e-lia.io\/wp-content\/uploads\/2023\/02\/E-lia-logo.svg","width":122,"height":44,"caption":"E-lia"},"image":{"@id":"https:\/\/e-lia.io\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/69587130\/"]},{"@type":"Person","@id":"https:\/\/e-lia.io\/en\/#\/schema\/person\/5446f7ef2b87fe46a081549c2cc653dc","name":"Kees van Nuland","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/secure.gravatar.com\/avatar\/b5819008a7de507cf4fed2e77945c8a3bf39ab060e9e3422cc6dd4f361e1dd7c?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b5819008a7de507cf4fed2e77945c8a3bf39ab060e9e3422cc6dd4f361e1dd7c?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b5819008a7de507cf4fed2e77945c8a3bf39ab060e9e3422cc6dd4f361e1dd7c?s=96&d=mm&r=g","caption":"Kees van Nuland"}}]}},"_links":{"self":[{"href":"https:\/\/e-lia.io\/en\/wp-json\/wp\/v2\/posts\/30428","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/e-lia.io\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/e-lia.io\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/e-lia.io\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/e-lia.io\/en\/wp-json\/wp\/v2\/comments?post=30428"}],"version-history":[{"count":3,"href":"https:\/\/e-lia.io\/en\/wp-json\/wp\/v2\/posts\/30428\/revisions"}],"predecessor-version":[{"id":32133,"href":"https:\/\/e-lia.io\/en\/wp-json\/wp\/v2\/posts\/30428\/revisions\/32133"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/e-lia.io\/en\/wp-json\/wp\/v2\/media\/30764"}],"wp:attachment":[{"href":"https:\/\/e-lia.io\/en\/wp-json\/wp\/v2\/media?parent=30428"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/e-lia.io\/en\/wp-json\/wp\/v2\/categories?post=30428"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/e-lia.io\/en\/wp-json\/wp\/v2\/tags?post=30428"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}